RINGER Projects

When tight inner-city conditions, varying room heights, and complex beams come together, intelligent formwork technology comes into its own.

Using formwork technology from the RINGER rental park, a large production hall with modern storage and work areas is being constructed near Ingolstadt. 

RINGER Master PRO bei Lifthallensanierung in Bottrop

At Europe's longest indoor ski hall, a 200-metre-long lift tunnel is being built on a former spoil tip using 1,400 m² of RINGER formwork.

Suspended RINGER stair towers from the modular scaffolding system were used for the construction of four 25-metre-deep microtunnels to supply power to voestalpine's new EAF.

Creative Quarter Munich – Revitalisation of historic industrial halls

Historic industrial buildings are being converted into new spaces for art and culture, with an innovative ‘house-within-a-house concept’ also being implemented.

New warehouse construction My Place

DEKplus ceiling tables and the fast AluDEK modular ceiling formwork were used in the construction of a new large warehouse.

Double railing scaffolding Mariahilfer Straße

MIT Gerüstbau deliberately chose the RINGER double railing scaffolding system – a system that impresses in terms of efficiency, safety and adaptability.

Wall and ceiling formwork systems from RINGER and digital concrete maturity testing ensured safe and efficient implementation.

The old structure was badly damaged and refurbishment was no longer economical. The massive abutments were constructed using RINGER formwork.

For the construction work, Eder Bau GmbH opted for the efficient double guardrail scaffolding - for safety, flexibility and efficiency.

Efficient formwork systems and flexible scaffolding solutions from RINGER were used for the construction of the BMW Group's state-of-the-art training centre.

42 m high scaffolding tower

The enormous height of the building required the construction of one of the highest scaffolding towers ever erected in Tyrol.

RINGER formwork was used for the new construction of a modern office building in Croatia due to the first-class exposed concrete quality.

RINGER AluDEK as a supplement to the filigree ceiling

Schweinsteiger Bau GmbH used the extremely fast AluDEK formwork in addition to the filigree slab for the new construction of a clubhouse in Upper Bavaria.

An agricultural hall with an area of 1,545 m² was formed using Master PRO steel frame formwork that can be operated from one side.

MIPA SE in Landshut - Office wing with RINGER formwork

The construction company commissioned with the construction, Baugeschäft Paul Meister e.K., relied on the advantages of RINGER's economical formwork solutions for the realization of this construction project.

New health center in Perg

The “Pebios” health center in Perg will be a modern center for medical care and age-appropriate living. Three different RINGER formwork systems were used for the shell construction.

A new federal senior center is being built in Upper Austria with a budget of 16 million euros. PORR Bau GmbH relies on rented slab formwork and wall formwork including accessories from RINGER for efficient construction.

Luxury Hotel Pontus Rotana Resort & Spa

The versatile and robust ST2000 steel frame formwork from RINGER was used for the shell of the Pontus Rotana Resort, saving time and money thanks to its flexibility and ease of use.

The ECM Group's new company site in Thalheim was completed in spring 2024. The RINGER DEKplus slab table was used to create a part of the building with a floating appearance.

An advanced center for research and teaching is being built in Vienna using complex cover construction methods. Formwork, scaffolding, special solutions and the rental service from RINGER were used in the realization of this gigantic construction project.

Guardrail clamps slab formwork Flex

The shell of a multi-storey residential complex was completed in Vienna. The Flex slab formwork proved its worth in the realization of the winding underground car park thanks to its exceptional flexibility and robustness.

Liftstützenschalung RINGER Stahl Master bei Kieserlbahn Großarl

In idyllic Grossarl, the new centrepiece of the Grossarltal-Dorfgastein ski area, the Kieserlbahn, was recently opened. The robust and safe formwork systems and scaffolding structures from RINGER were also used for the construction.

In Vöcklabruck, modern flats are being built with a focus on energy-efficient construction and green open spaces. Flexible and economical formwork solutions and the RINGER rental service were used for the construction.

RINGER formwork and scaffolding for new ÖBB goods supply building

A new ÖBB logistics centre was built on the banks of the Danube in Vienna's Brigittenau district. Thanks to the use of rented formwork and safety solutions from RINGER, as well as well thought-out planning, the project was completed on schedule.

Residential building project in Schwechat with Master PRO wall formwork

For a residential construction project in Schwechat, Dipl. Ing. Wilhelm Sedlak GmbH has once again opted for formwork systems and accessories from the RINGER rental park. The DEKplus and AluDEK slab formwork system family supported the fast and cost-efficient realisation of the construction project.

The property developer Alpenland is currently developing an extensive residential construction project in Wiener Neustadt. SWIETELSKY is consistently relying on the RINGER rental park for the shell construction in order to guarantee the highest standards and rapid construction progress.

Wohnen im Stadtzentrum Vöcklabruck

82 modern rental flats with balconies, loggias and terraces are being built in a prime location in Vöcklabruck. Due to the limited space available, the building project benefited from the Master PRO wall formwork, which can be operated from one side.

Wall formwork and slab formwork new company headquarter ETZI-Group

ETZI-Bau is building a new company headquarter for the entire ETZI Group in Ried im Traunkreis. A wide variety of formwork systems and the brand new DEKplus slab table from RINGER are being used to realize this ambitious construction project.

Double railing scaffolding with roof safety scaffolding

RINGER double railing scaffolding in galvanized design was used to ensure the safe and efficient modernization of the roof and facade.

Fish farm with Master PRO wall formwork

Formwork solutions from Austria were required as part of the implementation of a newly developed solution for the production of high-quality fish.

Wärmespeicher Fundamentschalung Stahl Master

An imposing heat reservoir is currently being built in the Sendling district of Munich at the combined heat and power plant South. For the foundation, Wadle Bauunternehmung GmbH relied on the high-performance steel frame formwork Steel Master from RINGER.

DEKplus Deckentisch von Ringer GmbH spielt eine zentrale Rolle bei Renovierungen

A grocery store in Styria is currently undergoing extensive modernization. The new DEKplus slab table from RINGER plays a central role in this process and is combined with two other formwork systems.

When constructing the slabs of the six-storey new building, the new slab table DEKplus in combination with the modular slab formwork AluDEK played an essential role.

A special construction project is currently taking shape in Enns, Upper Austria. Within only two months, the shell consisting of the foundation, columns and side walls was raised to a height of 28m.

The country’s tallest residential building is currently under construction in the capital of Slovenia. The project is supported by our local subsidiary.

RINGER AluDEK slab formwork was used on behalf of Rhomberg Bau GmbH. The smart combination of AluDEK with AL2000 elements allowed construction to progress quickly...

The renovation of the Innsbruck Cathedral called for high scaffolding skills. An impressive solution with the RINGER Module-Rolling Tower Public played a central role.

bauprojekt mit gerüst und kran von ringer gmbh

The previous grounds of the Eisen Wagner company are converted into a fitness studio and office building.

deckenschalung AluDEK wandschalung im wellnesshotel von ringer gmbh

The slab formwork AluDEK together with the AL2000 wall formwork ensures rapid construction progress in the extension of the Spa-Hotel Dilly in Windischgarsten

wandschalung stahlrahmenschalung bauprojekt von ringer gmbh

A new office building for Senata Holding is being built in Freising.

leichte Deckenschalungssystem AluDEK + Stahl Master Wandschalung von ringer gmbh

In addition to the proven Steel Master wall formwork, the lightweight AluDEK slab formwork system played a key role in the new building.

master PRO schalung in lagerhallo von ringer gmbh

The warehouse with a floor area of 1.900m² and a wall height of 6m was formed with the Master PRO.

schalungstakte mit planungstool BIM²form von ringer

When planning the formwork cycles, the RINGER engineering team used the newly developed planning tool BIM²form for the first time.

dibt zertifiziertes fassadengerüst deutschland von ringer gerüst & schalung

In Rheydt, in western Germany, 13 barrier-free new apartments with balconies are currently being built. 

wandschalung AL2000 handschalungssystem von ringer gmbh

A sustainable construction with an energy saving of more than 60% compared to average new buildings.

gewerbepark neubau von ringer gerüste und schalungen

The construction project envisages the construction of a new commercial building with a workshop, physio office, offices and a radio studio.

wildbach verbauuung schutzprojekt von ringer gmbh

The Pöllinger Bach at Treffen at Ossiacher See is currently being constructed to protect against natural hazards.

gattenburggasse bauprojekt gerüste von ringer gmbh

116 new residential units are being built from the former administrative building in Döbling.

bauprojekt seepark oggau von ringer gerüste und schalungen

The feel-good oasis on the shores of Lake Neusiedl should be completed by 2022.

wohnanlage pogrelzstrasse wien neubauprojekt gerüste von ringer gmbh

A new building project with a total of 229 subsidized rental apartments is being built in Vienna's 22nd district.

bauprojekt schule in frankenburg von ringer gmbh gerüste und schalungen

A new school center will be built in Frankenburg by the start of school in 2022.

bauprojekt wohnanlage wolfgangsee von ringer gerüste und schalungen

A 6-storey residential complex is currently being built on the edge of Lake Wolfgangsee.

gesamtschule münchen sanierung und neubau von ringer gmbh

New construction and refurbishment of the comprehensive school in Munich. 

komplettsanierung burg mit ringer gerüste und schalungen

Schlaining Castle was completely renovated in the course of the anniversary state exhibition that will take place in spring 2021.

neubau eigentumswohnungen mödling von ringer gmbh

From the spring of 2019 to the beginning of 2021 new stylish condominiums were built in Mödling, Austria.

doppelgeländergerüst im mehrfamilienhaus hennef von ringer gerüste und schalungen

Efficient construction work thanks to RINGER Doublerailing Scaffolding.

stahl master im kunstpark von ringer gmbh gerüste und schalungen

Construction of 275 apartments and 86 semi-detached houses and townhouses with steel master. 

neubau bauprojekt ringer gmbh schalungen und gerüste

The Austrian "Worker Association" Ried im Innkreis is being rebuilt at the same location.

tiefgarage erweiterung von ringer gmbh schalungen und gerüste

Ready for winter season! The restaurant and hotel Hoagascht expands its parking facilities.

neubau eigentumswohnungen mit gerüst in wien von ringer gmbh

Within 2 years fantastic condominiums with a central location in Simmeringer Grätzl will be created.

During the winter of 2021 new flats will be build up in Salzburg

neuapostolische kirche vollbetonbauweise ringer gerüste und schalungen

The New Apostolic parish of Steyr erected a new, modern church building. The construction company Mayr-Bau from Steyr relied on the delivery program from RINGER to erect the walls in full concrete construction.

Ringer supplies perfect scaffolding and formwork solutions for the building of a new campus in Voecklabruck.

apartments hotel regensburg von ringer gmbh

As a historic city, Regensburg attracts many travelers and tourists and is one of the top locations in Bavaria. However, an innovative idea for living was still missing. Marina Apartment Regensburg combines the familiarity of an own apartment with the comfort of a hotel. 

wandschalungen und zubehör für wohnanlage von ringer gmbh

Between February 2019 and August 2020 the "Kirchenwirt" in Muenster was completely rebuilt to a residential complex. RINGER supplied wall formwork and accessories.

gewässerschutzbecken packsattel von ringer gmbh

Environmental awareness is changing society. Heavy traffic and transport has been leading towards more poluted surface water, which needs to be purified in water protection basins.

wasserkraftwerk eisentratten ringer gmbh

Environmental awareness is leading towards a social change of consciousness. Ecologic renewable energy was brought into focus and is paving the way into a healthy future.

güllebehälter mit bogenblech von ringer gmbh

A perfect edge for a slurry tank thanks to Ringer curved sheet. In agriculture slurry is used as an important fertilizer because of its high content of nitrogen, phosphorus and calium.

sanierung festung hohenwerfen gerüste von ringer gmbh

A historically significant and large complex like the Fortress of Hohenwerfen requires not only special solutions for renovation tasks but also reliable scaffolding!

hotelerweiterung katschberg mit ringer schalungen und gerüste

Winter tourism is booming and has been growing over the last years. Hotel Katschberg met the growing demand with an expansion.

weber original store mit grillakademie und restaurant von ringer gmbh

Good news for barbecue fans. In Seiersberg-Pirka Weber builds a new Weber Original Store with a barbecue academy and a restaurant.